Check design numbers against rule-of-thumb ranges for the building type.
Doing this for a whole building? See this step inside a connected AIM Works project — loads, ventilation, equipment, and Design Review in one place.
Book a Demo →The Design Sanity Checker is a fast gut-check for HVAC sizing numbers. Enter floor area, building type, cooling tons, heating MBH, supply CFM, and optionally chilled-water GPM, and it computes the intensity ratios engineers use to judge whether a design is in the right ballpark — then flags each one green, amber, or red against typical ranges.
It is meant to catch the obvious mistakes — a misplaced decimal, a transposed digit, the wrong unit — before they make it onto a schedule. It is a screening aid, not a load calculation; benchmark ranges vary widely with climate, glazing, occupancy, and process loads.
| Area per ton | ft²/ton = floor area ÷ cooling tons |
| Airflow density | CFM/ft² = supply CFM ÷ floor area |
| Heating density | BTU/hr/ft² = (MBH × 1,000) ÷ floor area |
| Coil airflow | CFM/ton = supply CFM ÷ cooling tons |
| Chilled water | GPM/ton = chilled-water GPM ÷ cooling tons · implied ΔT = 24 ÷ GPM/ton |
Each ratio is compared to a typical range for the chosen building type. In range passes. For ft²/ton, CFM/ft² and heating BTU/hr·ft², the warning zone runs from 0.6× the low end to 1.5× the high end of the load intensity (for ft²/ton that is low ÷ 1.5 to high ÷ 0.6); beyond it fails, high or low. CFM/ton passes at 350–450 and warns at 250–600; GPM/ton passes at 1.5–3.5 (16–7°F ΔT). The ft²/ton, CFM/ft², heating and CFM/ton bands are the ones the AIM Works app uses to benchmark a load calc (restaurants are banded separately here). They are common rule-of-thumb practice, not code minimums, and never replace a room-by-room load calculation. CFM figures assume sea-level air; at 5,000 ft the same load needs about 20% more CFM.
AIM Works brings peak loads, ASHRAE 62.1 ventilation, equipment and plant sizing, compliance checks, Design Review, and engineering deliverables into one connected mechanical design workspace.
Results are design estimates for preliminary sizing. Verify final designs against applicable codes and standards — engineering judgment and a licensed professional engineer’s review are required.